10th July 2020

More and more of the building is becoming enclosed as panels continue to go up. Plenty going on on the inside as well as the internal workings of the building are installed. 

After all the services have been installed in the risers, we can put the last wall on to close it in!

As timber framing continues we are now preparing for window install, and getting one step closer to closing the building in.

Our first stair is in place! Like our panels, the stairs are prefabricated off site. The landing must now be poured before the next stair can be installed.

Our crane can lift panels of up to 6 tonne. For the heavier panels we are having to get special mobile cranes in to do the lifting. 

Whilst the crane holds the precast panel in place, our riggers bolt the panel to the bracket, a precision operation!

As part of the waterproofing system for the balconies a torch on membrane is applied over the plywood and joists. 

CONTACT

If you have property, development or construction needs, or know someone who does, we would be delighted to hear from you!

Chris Goldsbury

Director & General Manager

Tel: 027 675 2862

Nigel Butt

Director & Commercial Manager

Tel: 021 227 6262

hiclipart.com.png

Postal Address: PO Box 11012, Manners St 6142

MB_Logo_4Col_RGB-removebg-preview.png
BCITO_Business_qual_seal_black_300dpi_RGB-removebg-preview.png
IWD_sticker_for_web-removebg-preview.png
bottom of page